November 23, 2026

Tongi plant trips within 6 hrs of inauguration

Tongi peaking plant tripped for technical faults within six hours of its inauguration by Prime Minister Khaleda Zia.

bdnews24.com News Service

bdnews24.com

Published : 03 Sep 2005, 06:00 PM

Updated : 18 Aug 2022, 11:58 AM

Gazipur, Sept 4 (BDNEWS) – Tongi peaking plant tripped for technical faults within six hours of its inauguration by Prime Minister Khaleda Zia. Despite hectic efforts by the engineers across Sunday, the 80-megawatt plant, which went out of order at 7:15 am Saturday, could not be reactivated till filing of this report. In the wake of the generation suspension, Power Development Board chairman ANH Akhtar Hossain visited the plant Sunday. Rezaul Karim, the executive engineer of the plant, said power generation came to a halt due to a trouble in the circuit breaker of the grid. A source said a 30-48 hours break is required for resuming generation at the plant. After test run since March 14 this year, Prime Minister Khaleda Zia inaugurated the plant on Saturday. The plant had been supplying electricity to the national grid since the trial run. However, it experienced disruptions in generation several times during the test operation. BDNEWS/2015 hrs.
Related Stories