November 24, 2026

India puts sharing of water of Teesta and 6 other rivers pending till next JRC meet

India has put the water-sharing of the Teesta and six other common rivers pending until the next Indo-Bangla Joint River Commission (JRC) meeting while it reassured Bangladesh that the present UPA government will not even link the tributaries in the Himalayan zone.

bdnews24.com News Service

bdnews24.com

Published : 20 Sep 2005, 06:00 PM

Updated : 18 Aug 2022, 12:02 PM

Dhaka, Sept 21 (BDNEWS) - India has put the water-sharing of the Teesta and six other common rivers pending until the next Indo-Bangla Joint River Commission (JRC) meeting while it reassured Bangladesh that the present UPA government will not even link the tributaries in the Himalayan zone. "Brahmaputra has a lot of tributaries. But these are in the Himalayan zone, none in the South zone. Since the entire linking concept of the present UPA government is not in the Himalayan zone, so the question of linking tributaries does not arise," Indian water resources minister Priyaranjan Das Munshi told journalist replying to a question whether India has any plan to link the branch rivers of Himalayan zone. Addressing a press conference at the end of two-day Indo-Bangla JRC meeting here, the Indian Minister faced a volley of questions on the much-talked-about river linking project, Tipaimukh dam, river erosion and flood forecasting. Before the press conference, the agreed minutes were signed and the two ministers exchanged the notes. Priyaranjan Das Munshi narrated the outcome of the two-day meet as "constructive and fruitful". "India will not do anything that harm Bangladesh in any way," he assured. Admitting the fact that river erosion in the Bangladesh side is "very serious", Munshi said they will visit the erosion-prone spots this year and jointly address the problem. But the Indian Minister Tuesday told journalists that both the ministers would visit the rivers, which are severely erosion-affected for withdrawal of water from the Indian side, after the Eid-ul-Fitr and make a report on it. The water sharing of the Teesta and six other rivers raised by Bangladesh in the meeting could not make much headway with Indian side referring it to the Joint Technical Committee meeting for discussion keeping the issue unresolved in the two-day JRC meeting ended Tuesday. However, Munshi narrated it as a "step forward" saying that the committee will work out a modalities and development of flows, and then hand it over to the JRC. As a reporter painted a grim picture of Northern Bangladesh due to the withdrawal of water by India, Munshi, in a rhetorical explanation, said, "We take time due to our Constitution obligation. But, I do not want to live with an attitude to see the drying of this side of the river and full of water on the other side. The agreement will be made and water will come." About the Tipaimukh dam, the Indian Minister said they have not yet prepared any plan or design, and it would take time to prepare. "We have also assured that we will not construct any structure in Fulertola near Tipaimukh. However, I will finally inform it in the next JRC," Munshi said. He said the Tipaimukh is a hydropower project and it is not any irrigation project. During the two-day meeting, the Indian side exhibited "indifferent attitude" towards Bangladesh's major concerns like river-linking project, Tipaimukh dam, erosion in Bangladesh side in the bordering rivers and sharing of water of the Teesta and other six common rivers, meeting sources said. BDNEWS/1456 hrs
Related Stories