Published : 03 Oct 2014, 12:15 PM
Updated : 22 Jul 2022, 04:11 AM
The highways are seeing a sudden surge in traffic volume with people leaving Dhaka in droves to spend Eid-ul-Azha and Durga Puja holidays back in their village and town homes.
Vehicles are almost at a standstill on a 25-km stretch of the Dhaka-Tangail highway in Gazipur's Chandra since the early hours of Friday.
Traffic is also moving at a snail’s pace on a 60-km patch between Chandra and the eastern end of the Bangabandhu Bridge in Tangail.
Officials have attributed the gridlock to highway repairs being undertaken in the Mouchak area of Gazipur with vehicles entering from feeder roads and a large number of cattle trucks hitting the arterial road.
Highway police’s Elenga outpost Sergeant Kamruzzaman said the jam started around 3am when several cattle-laden trucks broke down.
And that had affected the flow of traffic in Gazipur, too, said Gazipur Assistant Superintendent of Police Sanjit Kumar Roy.
One of the suffering passengers, Solaiman Miah said, “I started from Dhaka very early. It’s been six hours and we are yet to cross Chandra. Those who are overseeing road transportation have no idea what we are going through.”
However, Gazipur ASP (Traffic) Md Sakhawat Hossain said 42 police teams were working at Gazipur’s 42 points to ease the traffic jam.
Despite three observation towers in Tongi, Bhogra and Chandra and over 800 police officers on duty, coping with the traffic and clearing the gridlocks proved daunting, he added.
Meanwhile, a two-km long tailback of vehicles was seen in the morning at the Mawa ferry crossing point in Munshigannj, the gateway to the country’s southern part from Dhaka.
Mawa terminal’s BIWTC Manager Sirajul Haque said 17 ferries were operating at the time, but the massive flow of traffic far outmatched the service.
Over 300 vehicles were seen to be stranded on the road to the Mawa terminal around 10am Friday.
The situation was reported to be much the same at the Paturia ferry crossing station in Manikganj.
Thursday night’s eight-kilometre-long queue was said to have shortened but traffic movement was still painfully slow.
The holidays for the Eid and Puja begin on Saturday, but, with a weekend in between, Thursday was the last working day, triggering an exodus from the capital.
But hundreds of people suffered in stranded vehicles as the broken Dhaka-Tangail highway caused bottlenecks and lengthy tailbacks.
Officials have also attributed the gridlocks to rundown vehicles carrying sacrificial animals.