Published : 11 Jun 2015, 06:41 PM
Updated : 19 Oct 2022, 06:48 PM
Long traffic snarls have disrupted vehicular movement at Bhogra Bypass, Signboard and adjacent areas due to nearly knee-deep water on roads following shower since Thursday dawn.
“Water on the highway has slowed down the vehicular movement since morning. It has also caused long traffic congestion in the highway,” Naojor police outpost’s SI Md Mizanur Rahman said.
The commuters suffered a lot in the traffic congestion amid heavy downpour.
“The vehicles on the highway almost got stranded. I took a rickshaw after few minutes of walking, but the outcome was zero,” Md Aminul Islam, who was going to Jaydebpur from Basan, told bdnews24.com.
He later took another route to reach his destination.
Islam said a five-minute journey took him almost two hours and added students and female workers in local industries suffered the most.
Many commuters returned homes without going to work, locals said.
SI Rahman said different wings of police were trying to ease the congestion.
Bhogra police outpost’s SI Nazmul Haque Bhuiyan said the water on the highway began receding in the afternoon once the rainfall ebbed.
He, however, said the pressure of vehicles was still quite high.
Locals said due to a poor drainage system Bhogra, Bashan, Adhepasha, Autparha and other areas are waterlogged every monsoon.
Local Ward Councillor Faysal Ahmed Sarkar admitted that the drains were not adequate for clearing the water quickly.
Gazipur Roads and Highways Department (RHD) Engineer Md Sabuj Uddin Khan also blamed the drainage system for the inundation of the highway.
“Rain water does not gather on highways. But water from the adjacent areas flood them in the absence of outlets there,” he said.
He was worried about the damage the inundation could cause to the roads.
The Mogor Canal, which flows next to the highway, needed dredging and widening to solve the problem, he said.
The city corporation’s acting mayor, Md Asadur Rahman Kiran, said civic body workers were on the job to clear the water.
The measures would be taken for a permanent solution once the monsoon was over, he said.
Kiran and RHD engineer Khan were slated to hold a meeting on Thursday afternoon to discuss the matter.