Chittagong, July 3 (bdnews24.com) — Initial observations of the administration's committee to probe the tragedy at Battali Hill suggest that a weak foundation was probably why the retaining wall at the hill had collapsed.
The five-member committee spoke to locals, survivors and visited the scene of tragedy on Sunday. They are expected to hand over a report on July 6.
Seventeen people were buried alive in a rain-induced landslide at the bottom of Batali Hill at Tigerpass intersection on Friday.
"We're not experts, but in primary inspection, it seems that the wall collapsed because of its weak foundation," committee chief Chittagong additional deputy commissioner Ehsane Elahi told bdnews24.com.
"It seemed as though there were no channels for drainage on the wall, and the whip holes were closed," he said.
He added that the people living close to the wall may have closed the holes.
Some shanties were still standing, not far from the scene of tragedy. Ehsane Elahi said the city corporation had been asked to move them.
CCC COMMITTEE
Same day, Chittagong City Corporation's (CCC) probe committee seized six files related to the construction of the retaining wall.
Ward councilor and chief of the eight-member committee S M Iqbal Hossain on Sunday said the files were seized to check whether there was any fault or irregularity in the construction.
A contractor named Giasuddin built a 60-feet portion of the 360-feet wall, of which 30 feet collapsed on Friday.
ENGINEERS' COMMITTEE
A nine-member Engineers' Institution-constituted probe committee is also looking into the incident.
There was no control guidance drainage system in the wall, committee member Delwar Majumder told bdnews24.com.
"It was visible in primary inspection that the wall's construction was uncoordinated," he said.
The committee will hand over a report within a week.