Published : 04 Oct 2013, 04:16 PM
Updated : 09 Aug 2022, 11:10 AM
The blockade brought the traffic on the highway to a halt from 4am to 8am, creating congestion on either side of Meghna bridge, said police Sub Inspector Delwar Hossain.
Even after the blockade was lifted people suffered from long tailback until 12:30pm on the highway, said Delwar.
The traffic congestion stretched out to at least six km on either side of the bridge.
According to police, the scuffle started after a Comilla-bound goods-laden overweighed truck tried to cross the bridge ignoring signals from employees at the bridge’s toll plaza and weighing section at around 3:30pm.
At one point, the employees thrashed the truck driver and his assistants at Narayanganj’s Sonargaon.
In protest, truckers blocked the highway by placing their vehicle at the middle of the road. The blockade was withdrawn on local administration’s assurance to punish the erring persons.