November 21, 2026

Slow pace on Dhaka-Mymensingh highway

The Dhaka-Mymensingh highway has become riddled with potholes in places after a night of heavy rain, slowing down traffic and creating jams.

Gazipur Correspondent

bdnews24.com

Published : 15 Aug 2014, 02:04 PM

Updated : 19 Oct 2022, 07:36 PM

Moreover, parts of the road are broken due to the ongoing work to develop it into a four-lane highway.

"These water-filled potholes and mud are hampering vehicular movement," Naojor highway police Sub-Inspector Kamal Pasha said.

Police say there are numerous similar potholes on the Gazipur's Chandana-Chourasta to Rajendrapur road.

"At least six trucks got caught in these holes between 10pm Thursday and Friday morning leading to a traffic jam," said Sub-Inspector Mizanur Rahman.

He also blamed mindless overtaking for "unusual" gridlocks at times.

"It's not possible to pull out trucks stuck in the holes in time due to traffic jams. It takes nearly two hours to retrieve each truck," he said.

Although it was possible to remove the stranded trucks by 10am Friday, the traffic flow was quite slow.

The snail’s pace was causing long queues of vehicles on both ends of the road, the police officer said.

Related Stories