November 23, 2026

Nazimuddin Road drowns in never-ending monsoon waterlogging

The monsoon rain has brought the woes of the residents of Nazimuddin Road and adjacent areas in Old Dhaka back into sharp focus.

Obaidur Masum

bdnews24.com

Published : 13 Jul 2017, 01:41 AM

Updated : 19 Oct 2022, 03:41 PM

Also Read:

Season’s second highest rains leave Dhaka traffic crawling

Like previous years, rains have brought only troubles for these people who are wading through knee-deep dirty water every day on the clogged narrow lanes.

The sombre environment is visible at Chawkbazar, Begumbazar, and Bongshal where houses and roadside shops are inundated.

A 1.5 feet wide drainage pipe along the road is old and narrow, according to WASA and Dhaka South City Corporation.

As a result, the rainwater takes longer to drain out.

Knee-deep water was found on the road from Mamun Biriyani to Dhaka Central Jail intersection on Wednesday.

A similar scene was found on the road connecting Hossaini Dalan to Bakshibazar, Jollar Road, Bagichar Goli, Tantkhana Lane, Shuku Miar Goli, Nimtoli, Jamidargoli, Kobiraj Mosque Lane and Bakshibazar Lane.

Front gates and staircases of many houses on these lanes have been submerged. Rainwater has seeped into many roadside shops leading to their closure.

Students are the worst sufferers as they sometimes have to wade through the waist-deep water and sometimes pay extra fare to rickshaw-pullers to reach schools.

Tahura Akter Bipasha, a ninth grader at Anwara Begum Muslim Girls High School, said: “The road gets clogged whenever it rains. Then it gets difficult to get a rickshaw.”

Nazimuddin Road has been in this quagmire for the last 20 years, said Sagir Hossain, who runs a business in the area.

He pointed out that the situation has led to a business of rickshaw van-pullers who now remain standby on the roads.

“This is perhaps the only street in Dhaka which gets flooded even when it drizzles. The van pullers are on hand hereas they know this is the best time to make money.”

A van-puller, Felu Mia, said he had been charging Tk 10 per customer for the last three days.

The road in front of Mamun Biriyani is particularly a low one, said WASA Executive Director (drainage circle-1) Firoze Alam.

“The shape of the road here is like a boat. This is the middle part, so it takes more time for the water to recede.”

He, however, claimed that the drainage pipe works fine even though it is old.

“The rainwater travels five kilometres into the canal, so it takes longer,” said the WASA official.

A project has been sanctioned to fix the problem at Nazimuddin Road, said Dhaka South City

Corporation Executive Engineer Khairul Baker.

“The mayor is concerned about this area. Contractors have been assigned and they are already working on the project.

“It may take three months to fix the road,” said Baker, promising no more waterlogging on the road in next monsoon.

Related Stories