November 02, 2026

Barapukuria power plant resumes supply to national grid after repairs

Unit-1 supplies 55MW to national grid while other units remain offline or under maintenance

Dinajpur Correspondent

bdnews24.com

Published : 02 May 2026, 05:00 PM

Updated : 21 Aug 2026, 03:40 PM

The Barapukuria Thermal Power Plant in Dinajpur has resumed electricity generation after repairing a technical fault, restoring partial supply to the national grid.

On Friday, the 125MW unit-1 returned to operation and is now supplying 55MW of electricity to the national grid, said Chief Engineer Md Abu Bakar Siddique of the plant.

The coal-fired plant holds a total capacity of 525MW, consisting of two 125MW units and a third unit capable of producing 275MW.

Unit 2 has remained fully shut since 2020 due to a major breakdown, while Unit 3 has been offline since October for overhaul work.

On Apr 22, Unit 1 was forced to shut down completely after a boiler pipe ruptured when stones mixed with coal entered the system, halting production at 10:10pm.

Repairs have now been completed, allowing the unit to restart operations on Friday.

The chief engineer noted that the third unit should be operational by the middle of this month.

Related Stories